Production

Overview of production program:

1.1. Production program (in general)
2.2. Second pre-insulated pipe
1. 2.1. E +, insulation class 1 (standard PE pipe)
2. 2.2. E ++, insulation class 2
3. 2.3. E +++, insulation class 3
3.3. Third pre-insulated pipes – double insulation class 1 i 2
4.4. The pre-insulated pipe – spiral wrap
1. 4.1. Insulation class 1
2. 4.2. Insulation class 2
3. 4.3. Insulation class 3
5.5  Pre-insulated pipe for other fluids and gases
1. 5.1. galvanized pipe
2. 5.2. Copper pipe
3. 5.3. Plastic PP-R pipe

  • 6.1. Pre-insulated elbow
  • 6.2. Branch – “T” branches out
  • 6.3. Parallel “P” forks
  • 6.4. Reduction
  • 6.5. The pre-insulated fixed point
  • 6.6. The pre-insulated shut-off valves
  • 6.6.2. The pre-insulated combined shut-off valves
  • 6.7. axial compensator
  • 6.8. Joints HDPE coupling with shrink sleeve
    heat shrinkable joints
  • 6.9. End connector (plug)
  • 6.10. Compensation pillows
  • 6.11. End cap
  • 6.12. Rubber passage through the wall
  • 6.13. The tape warning
  • 7. A system for detecting moisture